DeskTalk Mapping the US data center buildout

Nov 9, 20262 pages页

From the report报告摘录Policy Restrictions: 36 states (including Ohio's 14 municipalities) impose welfare-focused data center moratoriums, varying in scope (grandfathering/capacity), directly constraining AI infrastructure buildout.

Inside the report报告内文 Verbatim from the original PDF — first pages原版 PDF 开篇原文 · 逐字摘录

CitiFX Wire Market Commentary - FXLM - Intended for Institutional clients only

DeskTalk - Mapping the US data center buildout By Varshi Karamsetty

Data center development has emerged as the AI trade’s latest constraint. However, Democratic midterm gains in key states point to a likely slowdown and raising the cost of projects rather than halting the build-out completely. That does not invalidate the AI selloff, as stretched valuations and elevated capex are still legitimate concerns.

Concerns about data center build-outs are not new (see our last update), but markets have been worried that sweeping wins could embolden Democrats to take a firmer stance. It's not just at Congress level, with deep dissatisfaction among the public too. Fifty local measures were on the ballot on Nov 3, with voters approving almost every moratorium under consideration. Ohio saw the strongest pushback, with at least 14 municipalities adopting bans or restrictions, including Sunbury, the proposed site of a $2bn Amazon project.

Already, there are 300 local data center pauses recorded in 36 states, Ohio accounting for the largest concentration of moratoriums. Current proposals are broadly focused on welfare, seeking to protect consumers from higher electricity costs and increasing transparency on energy and water use, but differ on how to manage growth. We would focus on these indicators:

Grandfathering: Whether moratoriums apply only to new applications or also approved projects that have yet to begin construction. Gilroy, California, exempted a facility already under construction. Loudoun, Virginia, grandfathered 17 pending applications.

Capacity affected: Watch the MW affected, not the number of projects, as many data center campuses have smaller sites.

Durability: Most moratoriums are temporary, lasting one or two years, with Emporia, Kansas seeing the longest ban at 10 years, specifically targeting high-impact data centers (either peak electricity load above 10MW or daily water consumption above 100,000 gallons).

Hyperscaler guidance: Any shift in capex commentary which indicates constrained capacity or power implies slowing demand. CoreWeave’s CEO has already written to Texas Governor-elect Hinojosa expressing the company’s willingness to help shape standards for future development.

At an index level, we still remain cautious. US CETS are not dip-buyers yet as they expect elevated headline risks in the coming days on the AI infrastructure cycle. Meanwhile, Global Equity Strategy downgraded US, global and European tech to Neutral (from Overweight). Fundamentals remain attractive, but positioning could adjust further into net short territory. We would wait for cleaner positioning before returning to our Overweight call.

At the state level, the direction is broadly consistent, although the approaches vary:

Source: Data-center counts are from this database. Operating and planned capacity only includes sites that publicly report data.

Must read: North America Telecommunications Infrastructure - Data Center Market Update; Unpacking Evolving Market Dynamics

Data Center Construction Projects: US Registry 2026

Projects Shaping America's Digital Future — National Data Center Database | American Digital Infrastructure Coalition

New to the desk? Get real-time macro and market insights delivered straight to your inbox — reach out to be added to the distribution.

The information in this communication, including any trade or strategy ideas, is provided by individual sales and/or trading personnel of Citi and not by Citi’s research department and therefore the directives on the independence of research do not apply. © 2024 Citigroup Inc. All rights reserved. CITI and Arc Design is a registered service mark of Citigroup Inc. Full disclaimers for NAM, EMEA and APAC

Read the full report + PDF阅读全文与 PDF

The full summary (4 key points) and the original Citi PDF are for MastermindX Pro members. 完整摘要(4 个要点)与 Citi 原始 PDF 为 MastermindX Pro 会员专享。

Read on MastermindX前往 MastermindX 阅读

Related institutional research相关机构研报

Not investment advice. MastermindX hosts third-party institutional research for reference and education; ratings and views are the authors', not ours. Browse the full Research Vault → 非投资建议。MastermindX 仅收录第三方机构研究,供参考与学习;其中评级与观点均属作者本人。浏览完整研报库 →